Mini Japan
A downloadable asset pack
Japanese Village - Tiny Low-Poly Pack
Bring your projects to life with this essential Japanese-themed asset pack! Designed with a focus on a clean, stylized low-poly aesthetic, this set is perfect for rapid prototyping, game jams, or casual games seeking a charming and optimized look.
What’s Included?
The pack features 25+ assets provided in .fbx, .gltf, and .obj formats, ensuring seamless integration with any modern engine like Godot, Unity, or Unreal.
- Architecture: Traditional houses (A & B variants), wooden bridges, and the iconic Torii gate.
- Urban Elements: Vending machine, street signs, and a sales stall.
- Lighting & Props: A variety of lanterns (Toro/Lamps), lamp posts, and paper lanterns.
- Environment: Bamboo stalks, rocks, water fountains, and water lilies for zen garden layouts.
Technical Highlights:
- Formats: .fbx, .gltf, and .obj included.
- Style: Stylized low-poly, optimized for mobile, web, and desktop performance.
- Flexibility: Works great for isometric, top-down, or third-person perspectives.
- Engine Ready: Tested for easy import and setup in Godot 4.x.
| Status | In development |
| Category | Assets |
| Author | Ely Dev |
| Tags | 3D, architecture, free, free-assets, japan, Low-poly, Modular |
| Content | No generative AI was used |
Download
Download
Japan.zip 941 kB



Leave a comment
Log in with itch.io to leave a comment.